Detailed Design of the Photovoltaic System and MV/LV Electrical Substation Gela Refinery
Design Stage: Detailed Design
Contracting Authority: ENI Power for ACEA
GEMATICA was responsible for the design of:
- 977.6kWp Photovoltaic System
- MV/LV Electrical Substation and Electrical Systems
Detailed Design of the Photovoltaic System and MV/LV Electrical Substation Gela Refinery

As part of the detailed design for the Gela Refinery, with ENI Power for ACEA as the contracting authority, GEMATICA was responsible for designing the 977.6 kWp photovoltaic system, the MV/LV electrical substation and the associated electrical systems.









