Detailed Design of the Photovoltaic System and MV/LV Electrical Substation Gela Refinery

Design Stage: Detailed Design

Contracting Authority: ENI Power for ACEA

GEMATICA was responsible for the design of:

  • 977.6kWp Photovoltaic System
  • MV/LV Electrical Substation and Electrical Systems

Detailed Design of the Photovoltaic System and MV/LV Electrical Substation  Gela Refinery

As part of the detailed design for the Gela Refinery, with ENI Power for ACEA as the contracting authority, GEMATICA was responsible for designing the 977.6 kWp photovoltaic system, the MV/LV electrical substation and the associated electrical systems.