FEATURES

Location Taipei - Taiwan - Republic of China
Final Customer DORTS - Department of Rapid Transit Systems
System Automatic Metro driverless (CBTC + On-Board Services)
Line 15.4 KM (1.12 KM underground, 14.1 KM overhead section). 47 stations and 1 depot
Vehicles 17 four-car trains + 3 Service Vehicles
Control Center Two Geographically distributed

 

TIME

Current Metro phase FAT - FIT
Estimated final supply handing over 2016

 

GEMATICA SoW

The Taipei circular line phase-1 route expands a total length of approx 15.4 km, and is fitted with 14 train stations (including 13 elevated stations and one underground station) (Y6 ~ Y19), and one train yard.
The total length of the North-to-South and Circular Lines will be about 51.9 km (Phase 2 and 3), with 46 stations (13
overpass-type stations and 33 underground-type stations)(Y1~Y44), and 3 maintenance facilities.
Gematica provides a turn key broadband Data Communication System for Taipei Circular Line (Phase 1) for:

  • Communication Based Train Control (CBTC)  (Wayside, Center, On-Board)
  • On-board CCTV;
  • On-board diagnostic.

For all these subsystems are guaranteed high reliability, security, redundancy.
Wireless Connection is realized by a radiating cable DAS.